Construction Progress
Click thumbnail for a larger image.
2009 Construction
| May |
| North Entry - Snowmelt System |
 |
NW Parking Lot |
 |
| Picnic tables, umbrellas and benches installed |
 |
North and South Parking Lots |
 |
| Secured Parking Gate Installed |
 |
Basement High Density Filing |
 |
| North Entry Canopy |
 |
South Elevation - KCHSC Sign Installed |
 |
| April |
| Southwest Elevation |
 |
Snowmelt System for Sidewalk Concrete |
 |
| Excavation of NW Parking Lot |
 |
North Driveway at Loading Dock |
 |
| March |
| Southwest Elevation |
 |
Installation of Toilet Partions in Progress |
 |
| Freight Elevator E-3 Work in Progress |
 |
IT Closet - 3rd Floor |
 |
| Finishes on 2nd Floor - Electrified Furniture Connections,
Paint, Carpeting, etc. |
 |
Penthouse Misc. Electrical Panel Work |
 |
| Wall Guards and Carpet Installed on 1st Floor Rooms |
 |
North Elevation |
 |
| February |
| Installed Ceiling Clouds and Light Fixtures on 1st Floor North West Corridor |
 |
Above Ceiling Pipe and Valve Labelling |
 |
| Above Ceiling Rough-in on 2nd Floor North East Corridor |
 |
Plumbing Fixtures installed on 2nd Floor |
 |
| Prep Work for Ceiling Clouds on 2nd Floor |
 |
Ceiling Tiles, Light Fixtures Installed on 2nd Floor |
 |
| Ceiling Grids, Duct Work, Stored Material, etc for the 3rd Floor |
 |
South West Elevation |
 |
| January |
| Triming & detailing of north curtain wall |
 |
Elevators E-1 & E-2 work in progress |
 |
| First floor bathroom fixtures |
 |
Installation of Kitchen equipments in progress |
 |
| Triming & detailing of north curtain wall |
 |
Elevators E-1 & E-2 work in progress |
 |
| First floor bathroom fixtures |
 |
Installation of Kitchen equipments in progress |
 |
2008 Construction
| December |
| Drywall finish - 1st floor north corridor |
 |
Quarry tile installed for 1st floor Employee Bathroom |
 |
| Cooler installed in Kitchen |
 |
Casework installation - 1st floor |
 |
| Drywall finishes on 2nd floor |
 |
3rd floor drywall stud framing and installed door frames |
 |
| Ductwork continues in the Penthouse |
 |
Piping connection to chiller |
 |
| November |
| Drywall Finish - 1st Floor |
 |
Mechanical Room - Penthouse |
 |
| Stud Wall Framing - 3rd Floor |
 |
Access Flooring Installation - 3rd Floor |
 |
| South Elevation with Brick Piers |
 |
Insulation of Drywall and Stud Walls on 1st Floor |
 |
| Access Flooring on 2nd Floor |
 |
Paving Northeast Porous Pavement |
 |
| October |
| Northeast lot - fine grading for porous paving |
 |
North curtain wall |
 |
| Southwest corner of building |
 |
Southeast corner of building |
 |
| Mechanical Penthouse - work in progress |
 |
Removal of concrete rubble encountered |
 |
| Drywall framing, electrical rough-in, wood blocking |
 |
Masonry brick wall - West elevation |
 |
| September |
| East brick wall completed |
 |
Chiller set in the enclosed screen wall |
 |
| Misc. piping installation in progress |
 |
South lot landscaping - trees & shrubs planted |
 |
| Metal wall panels installed at the Penthouse |
 |
Curtain wall frame installation |
 |
| South lot mini mesh fence installed |
 |
First floor interior stud wall framing & NW brick wall |
 |
| August |
| Roofing Installed. |
 |
Delivery of Chiller to site. |
 |
| East Wall - Exterior Stud Framing at Window Openings. |
 |
Started Brick Wall Installation. |
 |
| Interior 2nd Floor Column Enclosure Framing. |
 |
Rough-in Work in Progress on 3rd Floor - Duct Work, Piping. |
 |
| Penthouse Equipment Pads Poured. |
 |
South Lot Paving - 1st course. |
 |
| July |
| Concrete topping over precast slab (basement area) - 1st floor. |
 |
Roofing materials delivered to site for installation. |
 |
| North entry lobby slab on grade, in-floor heat loop. |
 |
Penthouse exterior stud wall framing. |
 |
| Spiral ductwork installation - 2nd floor. |
 |
3rd floor bathroom plumbing. |
 |
| Electrical ductbank, North. |
 |
Insulation, in-floor heat & slab on grade pour. |
 |
| June |
| 2nd floor slab. |
 |
Building north view, entry canopy. |
 |
| Building south west view. |
 |
Ductwork in progress. |
 |
| Stair two steel being installed. |
 |
Stair three concrete treads. |
 |
| Steel joist and roof decking. |
 |
Under slab plumbing rough-in, 1st floor. |
 |
| May |
| Metal decking on 2nd floor. |
 |
Piers & footings for main entrance canopy. |
 |
| South lot curb & gutter. |
 |
South lot retaining walls. |
 |
| South west section of building. |
 |
Steel erection. |
 |
| Structural steel erection continues. |
 |
West stair towers. |
 |
| April |
| Basement steel erection. |
 |
Basement steel erection. |
 |
| Elevators E1 & E2 masonry work. |
 |
Footings for emergency gen set, fire pump area. |
 |
| Structural steel delivered on site. |
 |
Structural steel erection. |
 |
| March |
| Earth retention system. |
 |
Earth retention system. |
 |
| Footing excavation, resteel & formwork. |
 |
Formwork & resteel for basement walls. |
 |
| Freight elevator pit excavation, resteel placement. |
 |
Sanitary line tie-in at Jefferson Avenue. |
 |
| South lot water retention drainage system. |
 |
South lot water retention drainage system. |
 |
2007 Construction
| December |
| Demolition of existing building. |
 |
Demolition of existing building. |
 |